F16. ITP Trade work
Home
9
Form
9
F16. ITP Trade work
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Unique ID
Project
Sample Project with Related Forms
Test Project
Test Card
Test Project 1
New Project
Site Name
– No Results –
Compliant
C
2
Improvement Possible
IMP
1
Non-Compliant
NCR
-1
Not Applicable
N/A
0
1. Approvals
Inspection Method
Approved plans
Shop drawings
Specification
Certifier inspection.
Acceptable Inspection Criteria
Visual
Frequency
Prior to commencing
On completion
Add another approval
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Add another approval
Remarks
Upload Documents
Drop files here or
Select files
Max. file size: 64 MB.
2. Receive Materials
Inspection Method
Visual
Acceptable Inspection Criteria
As per spec
Frequency
Prior to Commencing
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Remarks
Add photo / Delivery dockets
3. Materials protected
Inspection Method
Visual
Acceptable Inspection Criteria
As per spec
Frequency
On completion
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Remarks
Add Photo
4. Completed Work is satisfactory
Inspection Method
Visual
Acceptable Inspection Criteria
As per spec
Frequency
Once Installed
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Remarks
Add Photo
5. Only completed work invoiced
Inspection Method
Visual
Acceptable Inspection Criteria
As per spec
Frequency
Once Installed
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Remarks
6. Final Inspection
Inspection Method
Visual
Acceptable Inspection Criteria
As per spec
Frequency
Once Completed
Verified
Compliant
Improvement Possible
Non-Compliant
Not Applicable
Work Status
Stage claim
Works complete
Remarks
Section End
Contractor name
– No Results –
Trade Name
– No Results –
Signature